The Kinskuch River project will generate a total estimated capacity of 76 MW in the coastal region of northern B.C.
This project is located 50 km east of Stewart, where a high-elevation intakes is located on the Kinskuch River. The diverted flow will be channeled into buried penstock leading to a low-elevation powerhouse that connects a newly constructed power line for tie-in to the BCTC 1L381 line.